DakotaDome Roof Replacement
Crane, rigging, and material hoisting support for the replacement of the DakotaDome’s rubberized roof, including all lift planning for a 100-foot hoist height at a 320-foot working radius.
The Project
Landwehr’s crane and rigging team supported MJ Dalsin Roofing & Sheet Metal on the replacement of the DakotaDome’s rubberized roof in Vermillion, South Dakota — home to the University of South Dakota athletics and a hub for community events since 1979. The job ran on a strict on-site window: the crane was rigged and set on Monday, and all work was complete and the lot cleared ahead of the required 3 p.m. Friday deadline. Once rigged, the crew hoisted roofing materials 100 feet to the top of the dome at a 320-foot radius.
The Solution
The jobsite sat in a tight, high-traffic area on USD’s campus, with limited room for staging trailers and equipment. The team coordinated staging and parking lot closures to keep the lift zone clear while vehicle and pedestrian traffic continued to move through the site, including during active hoisting operations, all while managing unpredictable weather.
Photo Gallery
Ready to Work Together?
Tell us about your project, and we’ll connect you with the right team.