Highway 10 & 23 Interchange Reconstruction
Full reconstruction of the Highway 10 & 23 interchange for MNDOT, including three bridges, interchange regrading, utility and pipe work, paving, and signal and lighting systems.
Project Snapshot
85,000
Tons of removal
40,000
Linear feet of pipe
500,000
Cubic yards of earthwork
2.5 miles
Of 4-lane concrete paving
The Project
As Landwehr’s largest company project to date, this two-year reconstruction rebuilt one of St. Cloud’s busiest interchanges for MNDOT, the City of St. Cloud, and Benton County. The project replaced Highway 23 bridges and redesigned the interchange from an eight-ramp layout to a more efficient four-ramp folded diamond configuration, along with a new Fourth Street Southeast bridge over Highway 10.
The Solution
With traffic volumes on Highway 23 exceeding 26,000 vehicles a day, the project required extensive phasing and subcontractor coordination to keep the corridor moving throughout construction. The completed interchange was recognized with a performance award from MNDOT.
Photo Gallery
Ready to Work Together?
Tell us about your project, and we’ll connect you with the right team.