Minnesota Military & Veterans Museum Site Development
Site development for a 25-acre museum campus, including topsoil stripping and respreading, mass excavation, building excavation and backfill, site utilities, underground fire suppression tank excavation and backfill, and preparation of outdoor military equipment display pads.
The Project
Landwehr was contracted by Breitbach Construction Company to develop the site for the new 40,000 square foot museum and extensive outdoor display areas designed to showcase military vehicles, aircraft, artillery, and other historical artifacts.
The Solution
Our crew handled several major components of the site development, including:
- Stripping and respreading 30,000 CY of topsoil
- 50,000 CY of common excavation
- Excavation and backfill for the 40,000 SF museum building
- Installation of site utilities
- Excavation and backfill of an underground fire suppression tank
- Preparing multiple display pads for tanks, artillery, trucks, armored vehicles, helicopters, planes, and a B-52 bomber
Landwehr’s crane and rigging team also handled the relocation of macro artifacts for the museum.