Sacred Heart Grain Elevator Demolition

Demolition of the Farmward grain elevator and three grain bins, removal of the existing scale house, concrete foundation demolition, material recycling, and sitework and utility installation for a new scale house, all completed adjacent to an active railroad mainline.

Excavator tearing down a grain elevator

The Project

Landwehr’s demolition team completed the removal of the Farmward grain elevator and three grain bins in Sacred Heart, Minnesota, working just feet from a railroad siding and 35 feet from the mainline. The site included a 95-foot grain elevator and three bins up to 60 feet tall, along with a scale house that was cleared early in the project to allow Farmward to salvage two newer bins installed within the past two years. Landwehr also completed the sitework and utility installation for a new scale house to support the facility’s continued operations.

Yellow Excavator grain bin demolition

The Solution

With active rail lines running directly alongside the site, every phase of the work was carefully sequenced to keep material and equipment clear of the tracks. Structural materials were processed and hauled to a local scrap yard for recycling, and the concrete foundations were broken apart and hauled offsite to be crushed and reused. The project was completed successfully without debris reaching the tracks. 

Ready to Work Together?

Tell us about your project, and we’ll connect you with the right team.