Solar Site Preparation and Pile Driving

A well-designed solar field depends on civil work and post installation that match the plans. Build yours on accurate grade and piles driven to spec.

What Is Solar Site Preparation?

Solar site preparation includes the grading, pile installation, seeding and fencing needed to prepare land for a solar field. Our GPS-equipped fleet ensures every pile lands where the racking design calls for it.

Solar Systems We Support

From community solar gardens to utility-scale arrays, we prepare sites for these core installations:

Icon Single Panel Sun Blk

Community and Private Solar

Grading, access road and laydown yard construction, basin excavation, SWPPP services, seeding, fencing, and pile installation for community solar gardens and private ground-mounted arrays.

Icon Solar Panel Row Blk

Utility-Scale Solar

The full civil and foundation scope for utility-scale arrays.

Icon Solar Panel Arrows Blk

Fixed Tilt, Tracker, and Ballasted Ground Systems

Pile installation across major racking types, including pour-and-place ballasted and specialty-designed foundations.

Two Workers Operating Pile Driver Installing Post In Field

Production Iron for High-Volume Solar Fields

Landwehr runs a fleet built for high-volume grading and pile installation, matched to your project’s pace:

  • GPS-equipped dozers for efficient site grading
  • GPS-equipped pile drivers for precise post installation
  • Pile modeling and site modeling to plan layout before equipment mobilizes
  • Tracked pile rigs for steady helical anchor and pile driving
  • Staging yards for bulk component delivery
Construction Worker Using Level To Check Metal Post In Field

Single Contractor for Grading and Pile Driving

Running your grading and pile driving under one contract keeps every phase accountable to the same crew. Our team operates the grading equipment and tracked pile rigs directly, with no outside subcontractors added to the job.

Civil Work Scope

We handle all three phases of solar civil construction:

Icon Number 1 Blk

Site Grading & Earthwork

GPS-guided dozers lay out the field to exact grade before pile drivers mobilize, so post installation starts on a surface that’s already correct.

Icon Number 2 Blk

Access Roads & Laydown Areas

Temporary and permanent access roads and laydown yards give equipment and materials a designated path through the site.

Icon Number 3 Blk

Pile Installation & Testing

Every pile is verified with axial, lateral, and compression load testing, plus pull testing and side drilling for refusal remediation, so nothing goes to racking unconfirmed.

Frequently Asked Questions

Landwehr handles solar projects from 1 MW to 300 MW and larger, including community solar gardens, private ground-mounted systems and utility-scale fields. Our crews deliver grading and pile foundations across fixed-tilt, tracker and ballasted ground racking systems.

Landwehr crews work regularly in Minnesota, South Dakota, North Dakota, Iowa, Wisconsin, and Illinois. We also bid solar projects beyond that footprint, including in Indiana and Oklahoma, so ask about your project even if your state isn’t listed.

Yes, the same Landwehr crew handling your solar site’s grading and pile driving can take on adjacent civil scopes, like sitework, earthwork, or environmental remediation, without bringing in a separate contractor.

Yes, Landwehr is a member of MnSEIA, the Minnesota Solar Energy Industries Association.

Planning a Solar Project?

Tell us about your site, schedule, and the civil work ahead, and we’ll connect you with our renewable energy team.